JP "Autoputevi Republika Srpska" d.o.o. Banja Luka financed the development of the General Design for the expressway section in the eastern part of the Republic of Srpska, on the north-south corridor. Several alternative solutions were considered, and after a multifunctional analysis, a variant with a total length of approximately 160 km was selected.
READ MORE
For the expressway Sarajevo – Podromanija – Rogatica – Međeđa – Višegrad – Donje Vardište (border), activities are being carried out in cooperation with the European Commission to prepare project documentation. In March 2018, the Preliminary Design was submitted as part of the Preliminary Studies and Projects for the Construction of the Expressway on Route 3: Sarajevo – Vardište.
READ MORE
The Goražde – Foča – Gacko – Bileća – Trebinje project is located in the southeastern part of the Republika Srpska in Bosnia and Herzegovina and is part of the planned network of highways and expressways of the Republika Srpska. The expressway starts in the Ustiprača zone, where it connects to the planned Sarajevo – Vardište expressway, while the final point is located south of Trebinje, with a connection to the planned highway towards Montenegro.
READ MORE
In accordance with the obligations under the concession agreement, the Chinese concession partner Shandong, is obliged to develop a conceptual design for the Prijedor - Kozarska Dubica - Jasenovac expressway section, with a total length of approximately 45 km.
READ MORE
Amendments and supplements to the Spatial Plan of the Republic of Srpska until 2025 plan the Banja Luka - Čelinac - Kotor Varoš expressway. The public procurement plan of the PE "Autoputevi Republike Srpske" d.o.o. Banja Luka for 2025 does not plan funds for the development of the General Design for the section in question.
READ MORE